Skip to content

Free roof inspection at a time you pick, photos included: (252) 580-4799

Nashville · Rocky Mount · Red Oak · Lake Royale

(252) 580-4799
Two roofers working on a brick ranch home, half the roof stripped to bare decking, a dump trailer full of torn-off shingles and new shingle bundles in the driveway

ServicesRoof Replacement

Roof Replacement in Nashville, NC

Once a roof is past patching, we strip every old layer off your home and install a complete new system, from sheathing to ridge cap. You get a written scope, a start date you can count on and a call from us if weather shifts it.

When replacing beats repairing

Your roof works as one assembly: wood sheathing, underlayment, metal flashing, shingles and attic vents. A new roof makes sense when several of those parts are worn out at once, or when the shingles have lost so many granules that fixing one leak just moves the water to the next weak spot. If the damage is limited to one area, we tell you that and point you to roof repair instead.

We are a licensed general contractor in North Carolina and a GAF Master Elite Certified Contractor. A tear-off on a single-family home usually takes one to three working days on site. We plan the schedule around the forecast, and if rain or a late material delivery moves your date, we call you ahead of time so you are never waiting on a crew that is not coming.

What a replacement includes

Every old layer removed
Old shingles and felt come off completely, down to bare wood. Shingling over an existing layer hides soft spots and holds heat against the new roof, so we skip that shortcut.
Sheathing check and replacement
With the deck exposed, we look for rot, delaminated plies and popped nails in the plywood or OSB. Any sheet we replace gets photographed so you can see why.
Synthetic underlayment and leak barrier
A synthetic underlayment covers the whole deck. Self-adhering membrane goes into valleys and around vents and chimneys, the spots where water collects first.
Fresh metal at every edge
Drip edge, step flashing along walls and pipe boots are all new. Reused flashing that has already rusted or cracked is one of the most common causes of a leak in a brand-new roof.
Balanced attic ventilation
Soffit intake is matched to ridge vent or exhaust vents so hot, damp air can leave the attic. Without that airflow, long humid summers age shingles from below.
Shingles, nails and site cleanup
Architectural shingles go down following the maker's nail placement. Before the crew packs up, we run rolling magnets across the lawn, beds and drive to pick up stray fasteners and haul away all debris.

Signs your roof is ready to be replaced

  • Gritty buildup in the gutters

    Aging asphalt shingles lose their mineral coating. Piles of granules in gutters or at downspout outlets mean the asphalt below is taking direct sun.

  • Shingles lifting or bowing

    When tabs turn up at the corners or dip in the middle, the asphalt has dried out from heat. Those shingles no longer seal down and peel back in a strong gust.

  • Water stains in several rooms

    A single drip is often a repair job. Stains showing up in more than one room point to underlayment and flashing that are giving out across the roof.

  • A dip in the roofline

    A visible sag between rafters usually means the sheathing has soaked up water and weakened. It should be looked at before the rot reaches the framing.

  • An aging roof after a rough season

    Shingles late in their life crack and tear more easily in high wind. If yours have weathered several hard summers, a free inspection will tell you how much life is left.

What sets the price of a new roof

We price your roof from tape measurements, slope readings and what we find in the attic, then write it up as a line-item estimate after the inspection. A figure given over the phone before anyone has climbed a ladder is only a guess, and we would rather not give you one. If paying over time helps, financing is available through Acorn Finance.

Roof size and slope

Every 100-square-foot section of deck, which roofers call a square, takes its own share of shingles, underlayment and labor, so a bigger roof costs more. A steeper slope means roof jacks, harnesses and slower work on each row of shingles.

How many layers come off

A second or third layer of old shingles adds hours to the tear-off and weight to the dumpster.

Sheathing condition

Rotted plywood or OSB only shows once the shingles are off. Your estimate lists a set price for each replacement sheet, so nothing on the final bill comes as a surprise.

Valleys, dormers and penetrations

Chimneys, skylights, dormers and valleys each need their own flashing work, and every one adds time on the roof.

Attic airflow changes

Adding soffit vents or a continuous ridge vent to an attic with poor circulation adds to the job, but it stops trapped heat from baking the new shingles from below.

How your replacement runs, day by day

  1. 1

    Inspection, photos and estimate

    We get on the roof, look into the attic for staining and airflow, and take pictures of each problem. You receive a straight answer on repair versus replacement and an estimate broken out line by line.

  2. 2

    Start date and delivery

    After you approve, we set your start date and a morning arrival window. Shingles, underlayment and metal usually arrive a day or two before the crew does.

  3. 3

    Setting up to protect your home

    We lay tarps over shrubs and lean plywood against walls where debris falls, then place the dumpster where it is least in the way. We ask you to move cars and anything breakable near the exterior walls.

  4. 4

    Tear-off in sections

    We only strip as much roof as we can cover with underlayment that same workday. If a pop-up shower rolls in, open areas get tarped before anyone climbs down.

  5. 5

    Walk-through and haul-off

    Once the last ridge cap is on, we clear debris, sweep for nails and walk the roof with you. You also see the photos of any sheathing we swapped out.

Roofer in a safety harness kneels on an asphalt shingle roof with a clipboard, lifting a damaged shingle over exposed decking; ladder and brick homes behind.

Roof replacement questions

How many days will my roof take?

A typical single-family home takes one to three working days on site. Extra layers, a steep pitch or a cut-up roofline can stretch that. You get the expected length before we begin, and we call if weather changes it.

Should I stay home during the work?

You do not need to. We ask that the driveway is clear and that we can reach you by phone during the day. At the end of each workday we call to tell you what got done and what comes next.

What warranty comes with a new roof?

Our architectural shingle roofs carry a 5-year workmanship warranty from us. The shingles also have their own manufacturer coverage, and we walk you through what each warranty covers before you sign.

Will my insurance cover a replacement?

That depends on the cause. Wind or hail damage from a covered storm is treated differently from shingles that simply wore out. We can be there when the adjuster inspects and help with the claim paperwork, though the coverage decision is the adjuster's. Our storm damage repair page explains that side in more detail.

What if rain is forecast for my start date?

We check the forecast several days ahead. If rain looks likely, we call to move your date instead of opening a roof we cannot close up. After work starts, any exposed deck gets covered before the crew leaves each evening.

Two-story brick house with a gray shingle roof, a ladder against the garage eave, and shingle bundles and a tool bag on a tarp in the driveway

Find out if it is time for a new roof

We will inspect your roof, photograph what we see and tell you plainly whether repair or replacement makes sense. If you go ahead, you get a start date you can plan around.